Agenda item

RR/2021/2947/P - Former Putting Green Site – Land at Old Lydd Road, Camber

Minutes:

DECISION: GRANT (PLANNING PERMISSION) DELEGATED SUBJECT TO COMPLETION OF A SECTION 106 LEGAL AGREEMENT TO SECURE THE AFFORDABLE HOUSING

 

SUBJECT TO CONDITIONS:

 

1.      The development hereby permitted shall be begun before the expiration of three years from the date of this permission.

Reason: In accordance with section 91 of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).

 

2.      The development hereby permitted shall be carried out in accordance with the following approved drawings:

No. 001 Rev. P02 (Site Location Plan), dated 01/06/21

No. 003 Rev. P10 (Proposed Site Plan), dated 10/10/22

No. 004 Rev. P04 (Proposed Plans & Elevation Unit Type A), dated 06/10/22

No. 005 Rev. P04 (Proposed Plans & Elevation Unit Type B), dated 06/10/22

No. 006 Rev. P04 (Proposed Plans & Elevation Unit Type C), dated 06/10/22

No. 007 Rev. P04 (Proposed Plans & Elevation Unit Type D), dated 06/10/22

No. 008 Rev. P03 (Plots 1-4 Proposed Elevations Unit Type A), dated 05/10/22

No. 009 Rev. P03 (Plots 1-4 Proposed Elevations Unit Type A), dated 05/10/22

No. 010 Rev. P03 (Plot 5 Proposed Elevations Unit Type B), dated 05/10/22

No. 011 Rev. P03 (Plot 7 9 and 6 8 10 Proposed Elevations Unit Type C and D), dated 05/10/22

No. 012 Rev. P01 (Proposed Street Elevations Merchant Drive), dated 05/10/22

No. 013 Rev. P06 (Proposed Street Elevations Old Lydd Road), dated 05/10/22

No. 014 Rev. P06 (Proposed Street Elevations Old Lydd Road), dated 05/10/22

No. 015 Rev. P01 (Proposed Street Elevations Royal William Square), dated 05/10/22

No. 016 Rev. P02 (Proposed Site Block Plan), dated 10/10/22

Reason: For the avoidance of doubt and in the interests of proper planning.

 

3.      No development hereby permitted shall commence until a scheme for the provision of foul water drainage works has been submitted to and approved in writing by the Local Planning Authority and no dwelling shall be occupied until the approved drainage works to serve the development have been provided.

Reason: This pre-commencement condition is required to ensure the satisfactory drainage of the site and to safeguard the environment (including the nearby designated sites of importance for biodiversity) from pollution, in accordance with Policies SRM2 (i) and EN5 (ii) of the Rother Local Plan Core Strategy 2014 and Policies DEN4 (ii) and CAM1 (vi & vii) of the Development and Site Allocations Local Plan 2019.

 

4.      No development hereby permitted shall commence until details of a surface water drainage scheme have been submitted to and approved in writing by the Local Planning Authority. The drainage scheme shall be designed having regard to the following:

a)          Surface water runoff from the proposed development should be drained to the ground via infiltration. Evidence of this (in the form of hydraulic calculations) should be submitted with the detailed drainage drawings. The hydraulic calculations should take into account the connectivity of the different surface water drainage features.

b)          The details of the proposed permeable pavement and infiltration trench should be provided as part of the detailed design. This should include cross sections and invert levels.

c)          The detailed design should include information on how surface water flows exceeding the capacity of the surface water drainage features will be managed safely.

d)          The detailed design of the SuDS features should be informed by findings of groundwater monitoring between autumn and spring. The design should leave at least 1m unsaturated zone between the base of the ponds and the highest recorded groundwater level. If this cannot be achieved, details of measures which will be taken to manage the impacts of high groundwater on the drainage system should be provided.

e)          A maintenance and management plan for the entire drainage system should be provided and cover the following:

-             Clearly state who will be responsible for managing all aspects of the surface water drainage system, including piped drains.

-             Evidence that these responsibility arrangements will remain in place throughout the lifetime of the development.

The development shall not be occupied until evidence (including photographs) demonstrating that the surface water drainage scheme has been constructed in accordance with the approved details, has been submitted to and approved in writing by the Local Planning Authority.

Reason: This pre-commencement condition is required to ensure the satisfactory drainage of the site and to safeguard the environment (including the nearby designated sites of importance for biodiversity) from pollution, in accordance with Policies SRM2 (iii), EN5 (ii) and EN7 of the Rother Local Plan Core Strategy 2014 and Policies DEN4 (ii), DEN5 and CAM1 (vi & vii) of the Development and Site Allocations Local Plan 2019.

 

5.      No development hereby permitted shall commence until a Contaminated Land Assessment (CLA) has been submitted to and approved in writing by the Local Planning Authority. The CLA shall include the following details:

a)          The results of a full intrusive site investigation carried out in accordance with the recommendations set out in section 7.0 of the Omnia Phase I Geo-Environmental Site Assessment (Omnia ref: A11574/1.0), dated June 2021.

b)          If contamination is found to be present at the site, provide a remediation strategy and timetable detailing how this contamination will be dealt with.

Where remediation is required, the remediation strategy shall be implemented as approved. 

Reason: This pre-commencement condition is required to ensure that human health and the natural environment (including the nearby designated sites of importance for biodiversity) are not at risk from pollution, in accordance with Policies OSS3 (viii) and EN5 (ii) of the Rother Local Plan Core Strategy 2014 and Policies DEN4 (ii) and CAM1 (vi & vii) of the Development and Site Allocations Local Plan 2019.      

 

6.      If, during development, contamination not previously identified is found to be present at the site then no further development shall be carried out until a remediation strategy and timetable detailing how this contamination will be dealt with has been submitted to and approved in writing by the Local Planning Authority. The remediation strategy shall be implemented as approved.

Reason: To ensure that human health and the natural environment (including the nearby designated sites of importance for biodiversity) are not at risk from pollution, in accordance with Policies OSS3 (viii) and EN5 (ii) of the Rother Local Plan Core Strategy 2014 and Policies DEN4 (ii) and CAM1 (vi & vii) of the Development and Site Allocations Local Plan 2019.      

 

7.      No development hereby permitted shall commence until a Construction Environmental Management Plan (CEMP) has been submitted to and approved in writing by the Local Planning Authority. The CEMP shall set out, as a minimum, the timing of the works and site-specific measures to control and monitor impacts arising in relation to construction traffic, noise and vibration, dust and air pollutants, land contamination, surface water run-off and groundwater. It shall also set out arrangements by which the developer shall maintain communication with residents and businesses in the vicinity of the site, and by which the developer shall monitor and document compliance with the measures set out in the CEMP. The construction of the development shall be carried out strictly in accordance with the approved CEMP at all times.

Reason: This pre-commencement condition is required to safeguard the amenities of neighbouring properties and the surrounding area generally, and to safeguard the integrity of the adjacent designated sites of importance for biodiversity, in accordance with Policies OSS4 (ii) and EN5 (ii) of the Rother Local Plan Core Strategy 2014 and Policies DEN4 (ii) and CAM1 (vi & vii) of the Development and Site Allocations Local Plan 2019.      

 

8.      No development hereby permitted shall commence until construction details of the new pedestrian footway around the site have been submitted to and approved in writing by the Local Planning Authority and no dwelling shall be occupied until the pedestrian footway has been provided and constructed in accordance with the approved details.  

Reason: This pre-commencement condition is required to ensure satisfactory pedestrian access to the dwellings and to improve pedestrian access in the surrounding area, in accordance with Policy OSS4 (i) of the Rother Local Plan Core Strategy 2014 and Policy CAM1 (v) of the Development and Site Allocations Local Plan 2019.   

 

9.      No development above slab level shall commence until details of the following have been submitted to and approved in writing by the Local Planning Authority and the development shall thereafter be completed in accordance with the approved details:

a)          1:10 scale drawings of proposed details including fenestration, eaves details, dormer windows, porches, and utility boxes (including the location of such boxes on the buildings).

b)          Specifications and samples of the materials to be used in the construction of all external surfaces of the buildings.

c)          The proposed site levels and finished floor levels of all buildings in relation to existing site levels, and to adjacent highways and properties (including levels of paths, drives, steps and ramps).

Reason: To ensure a high building appearance and architectural quality, in accordance with Policy EN3 of the Rother Local Plan Core Strategy 2014.

 

10.    No development above slab level shall commence untilthe following public realm and hard landscaping details have been submitted to and approved in writing by the Local Planning Authority and the development shall thereafter be carried out in accordance with the approved details and prior to occupation of the first dwelling:

a)          Boundary treatments and means of enclosure (fences, railings and walls) indicating the location, design and materials of such, including to define and enclose the front gardens of the dwellings.

b)          Hard surfacing materials specification (samples/product literature) (including for road surfaces, paths, parking spaces and other areas of hardstandings).

         Reason: To ensure the creation of a high quality public realm, design quality, and landscape setting, in accordance with Policy EN3 of the Rother Local Plan Core Strategy 2014.

 

 11.   No development above ground level shall commence until the following soft landscaping details have been submitted to and approved in writing by the Local Planning Authority and the development shall thereafter be carried out as approved and in accordance with the agreed timetable for implementation:

a)          Detailed planting plans, supported by written material as necessary, setting out the mix of species, their size, number and planting densities as appropriate.

b)          The detail of all new trees, including their species, sizes, quantity, positions and how they will be protected and maintained until successfully established in accordance with BS5837:2012 “Tress in Relation to Design, Demolition and Construction – Recommendations”.

c)          Timetable for implementation of the soft landscaping works.

d)          Management responsibilities and maintenance schedules for the soft landscaped areas (except privately owned domestic gardens).

         Any trees or plants that, within a period of five years after planting, are removed, die or are seriously damaged shall be replaced by others of the same species, size and number as originally proposed, unless otherwise agreed in writing by the Local Planning Authority.

         Reason: To ensure the creation of a high quality public realm and landscape setting, and to enhance the biodiversity value of the site, in accordance with Policies EN3 and EN5 (ix) of the Rother Local Plan Core Strategy 2014 and Policy DEN4 (iii) of the Development and Site Allocations Local Plan 2019.

 

12.    No development above slab level shall commence until full details of the proposed air source heat pumps – to include noise levels, maintenance instructions and proposed locations on the dwellings hereby permitted – have been submitted to and approved in writing by the Local Planning Authority. The air source heat pumps shall be installed and maintained in accordance with the approved details.

Reason: To safeguard the amenities of neighbouring properties, in accordance with Policy OSS4 (ii) of the Rother Local Plan Core Strategy 2014.

 

13.    No development above slab level shall commence until details of a notice board for residents and visitors – to include design and materials of the notice board, content and location – which raises awareness of the importance of the adjacent Dungeness Complex of Natura 2000 sites – comprising the Dungeness, Romney Marsh and Rye Bay Special Protection Area and Ramsar site, and the Dungeness Special Area of Conservation – as well as ways in which visitors can avoid adversely impacting the sites when visiting, has been submitted to and approved in writing by the Local Planning Authority. The approved notice board shall be provided prior to occupation of the first dwelling and shall thereafter be retained.

         Reason: To ensure the development has no adverse effect on the integrity of the adjacent Natura 2000 Sites and supports the implementation of the Sustainable Access and Recreation Management Strategy, in accordance with Policy EN5 (ii) of the Rother Local Plan Core Strategy 2014 and Policies DEN4 (ii) and CAM1 (vii) of the Development and Site Allocations Local Plan 2019.

   

14.    At the time of construction and prior to occupation of the dwellings on Plots 1 to 4 hereby permitted, the bathroom windows at first floor level within the west elevations, as indicated on approved Drawing Nos. 004 Rev. P04 (Proposed Plans & Elevation Unit Type A), dated 06/10/22, and 008 Rev. P03 (Plots 1-4 Proposed Elevations Unit Type A), dated 05/10/22, shall be glazed with obscure glass of obscurity level equivalent to scale 5 on the Pilkington Glass Scale and shall thereafter be retained in that condition.

Reason: To safeguard the amenities of neighbouring properties, in accordance with Policy OSS4 (ii) of the Rother Local Plan Core Strategy 2014.

 

15.    At the time of construction and prior to occupation of the first dwelling, a single integrated bat tube shall be incorporated into the fabric of each new dwelling hereby permitted, as detailed in section 5.5.3 of the ECOSA Ecological Impact Assessment (Report ref: 22.0186.0001.F0), dated November 2022, and the bat tubes shall thereafter be retained.

Reason: To enhance the biodiversity value of the site, in accordance with Policy EN5 (ix) of the Rother Local Plan Core Strategy 2014 and Policy DEN4 (iii) of the Development and Site Allocations Local Plan 2019.   

 

16.    The completed vehicular accesses shall have maximum gradients of 4% (1 in 25) from the channel line for 2m or for the whole width of the verge whichever is the greater and 11% (1 in 9) thereafter.

Reason: To ensure the safety of persons and vehicles entering and leaving the accesses and proceeding along the highway, in accordance with Policies CO6 (ii) and TR3 of the Rother Local Plan Core Strategy 2014.

 

17.    No dwelling hereby permitted shall be occupied until the vehicular accesses serving the development have been constructed in accordance with the approved drawings.

Reason: To ensure the safety of persons and vehicles entering and leaving the accesses and proceeding along the highway, in accordance with Policies CO6 (ii) and TR3 of the Rother Local Plan Core Strategy 2014.

 

18.    The main vehicular access from Marchants Drive shall not be used until visibility splays of 2.4m by 43m are provided in both directions and maintained thereafter.

Reason: To ensure the safety of persons and vehicles entering and leaving the access and proceeding along the highway, in accordance with Policies CO6 (ii) and TR3 of the Rother Local Plan Core Strategy 2014.

 

19.    No dwelling hereby permitted shall be occupied until motor vehicle parking and turning areas have been provided in accordance with the approved drawings. The motor vehicle parking and turning areas shall thereafter be kept available for the parking and turning of motor vehicles and shall not be used for any other purpose.

Reason: To ensure there is adequate parking provision and to ensure the safety of persons and vehicles entering and leaving the accesses and proceeding along the highway, in accordance with Policies CO6 (ii), TR3 and TR4 (i & iii) of the Rother Local Plan Core Strategy 2014.

 

20.    The motor vehicle parking spaces shall measure at least 2.5m by 5m (add an extra 50cm where spaces abut walls/fences).

Reason: To provide adequate space for the parking of vehicles and to ensure the safety of persons and vehicles entering and leaving the accesses and proceeding along the highway, in accordance with Policies CO6 (ii), TR3 and TR4 (i & iii) of the Rother Local Plan Core Strategy 2014.

 

21.    No dwelling hereby permitted shall be occupied until a secure cycle store for each dwelling has been provided in accordance with details that have been submitted to and approved in writing by the Local Planning Authority and the cycle stores shall thereafter be retained for that use and shall not be used other than for the parking of cycles.

Reason: In order that the development site is accessible by non-car modes and to meet the objectives of sustainable development, in accordance with Policies PC1 and TR3 of the Rother Local Plan Core Strategy 2014. 

 

22.    No external lighting shall be installed until a "lighting design strategy for biodiversity" for the development hereby permitted has been submitted to and approved in writing by the Local Planning Authority. The installation of any external lighting shall thereafter only be undertaken in accordance with the approved strategy and shall be retained as such thereafter.

Reason: To mitigate the effects of artificial lighting on bats, in accordance with Policy EN5 (ix) of the Rother Local Plan Core Strategy 2014 and Policy DEN4 (ii) of the Development and Site Allocations Local Plan 2019.  

 

23.    The dwellings hereby permitted shall not be occupied until they have been constructed in accordance with Part M4(2) (accessible and adaptable dwellings) of Schedule 1 of the Building Regulations 2010 (as amended) for access to and use of buildings.

Reason: To ensure that an acceptable standard of access is provided to the dwellings, in accordance with Policy OSS4 (i) of the Rother Local Plan Core Strategy 2014 and Policy DHG4 of the Development and Site Allocations Local Plan 2019.

 

24.    The dwellings hereby permitted shall meet the requirement of no more than 110 litres/person/day water efficiency set out in Part G of Schedule 1 of the Building Regulations 2010 (as amended) for water usage. The dwellings hereby permitted shall not be occupied until evidence has been submitted to and approved in writing by the Local Planning Authority to demonstrate that they have been constructed to achieve water consumption of no more than 110 litres per person per day.

Reason: To ensure that the dwellings are built to acceptable water efficiency standards in line with sustainability objectives and in accordance with Policy SRM2 (v) of the Rother Local Plan Core Strategy 2014 and Policy DRM1 of the Development and Site Allocations Local Plan 2019.

 

25.    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification) no extension beyond the rear wall of the dwellings on Plots 2 to 10 hereby approved, or beyond the north wall of the dwelling on Plot 1 hereby approved, shall be constructed.  

Reason: To ensure appropriate outdoor amenity space is retained for occupiers of the dwellings, in accordance with Policy OSS4 (i) of the Rother Local Plan Core Strategy 2014 and Policy DHG7 (i) of the Development and Site Allocations Local Plan 2019.

 

26.    Notwithstanding the provisions of the Town and Country Planning (General Permitted Development) (England) Order 2015 (or any order revoking and re-enacting that Order with or without modification) no development permitted by Class E of Part 1 of Schedule 2 of the 2015 Order (as amended) shall be erected within the curtilage of any dwelling hereby approved.

Reason: To ensure appropriate outdoor amenity space is retained for occupiers of the dwellings, in accordance with Policy OSS4 (i) of the Rother Local Plan Core Strategy 2014 and Policy DHG7 (i) of the Development and Site Allocations Local Plan 2019.

 

NOTES:

 

1.      The development is subject to the Community Infrastructure Levy (CIL). Full details will be set out in the CIL Liability Notice which will be issued in conjunction with this decision. All interested parties are referred to http://www.rother.gov.uk/CIL for further information and the charging schedule.

 

2.      The landowner and/or developer is advised that Sussex Police have made recommendations on the proposal from a crime prevention viewpoint. Their details comments are available to view on the planning website.

 

3.      The landowner and/or developer is reminded that, under the Conservation of Habitats and Species Regulations 2017 (as amended) and the Wildlife and Countryside Act 1981 (as amended), it is an offence to (amongst other things): deliberately capture, disturb, injure or kill great crested newts; damage or destroy a breeding or resting place; deliberately obstruct access to a resting or sheltering place. Planning approval for a development does not provide a defence against prosecution under these acts. Should great crested newts be found at any stages of the development works, then all works should cease, and Natural England should be contacted for advice.

 

4.      The landowner and/or developer will be required to enter into a Section 184 Licence with East Sussex Highways, for the provision of the new vehicular accesses. The Applicant is requested to contact East Sussex Highways (0345 60 80 193) to commence this process. The Applicant is advised that it is an offence to undertake any works within the highway prior to the licence being in place.

 

5.      The landowner and/or developer is advised that the provision of the new 2m wide pedestrian footway along the site’s frontages with Old Lydd Road and Marchants Drive is likely to require a ‘deed of dedication’ in order that the footway can be constructed to an adoptable standard. The footway will require constructing in accordance with East Sussex County Council specification with all works carried out by an approved contractor under the appropriate legal agreement. 

 

6.      The development will be subject to the requirements of the Building Regulations, and advice should be sought from the East Sussex Building Control Partnership. No work should be carried out until any necessary permission has been obtained.

 

7.      The developer should take all relevant precautions to minimise the potential for disturbance to adjoining occupiers from noise and dust during the construction period. This should include not working outside the hours of 8am to 6pm Monday to Friday, 8am to 1pm on Saturdays, and no such work should take place on Sundays or Bank Holidays.

 

NATIONAL PLANNING POLICY FRAMEWORK: In accordance with the requirements of the National Planning Policy Framework (paragraph 38) and with the Town and Country Planning (Development Management Procedure) (England) Order 2015, the Local Planning Authority has acted positively and proactively in determining this application by identifying matters of concern within the application (as originally submitted) and negotiating, with the Applicant, acceptable amendments to the proposal to address those concerns. As a result, the Local Planning Authority has been able to grant planning permission for an acceptable proposal, in accordance with the presumption in favour of sustainable development, as set out within the National Planning Policy Framework.

 

(Councillor Bayliss declared a Personal Interest in this matter in so far as she was a Cabinet Member at Rother District Council and had approved the grant award and disposal of this site at earlier Cabinet meetings and in accordance with the Members’ Code of Conduct remained in the room during the consideration thereof but chose not to vote).

 

Supporting documents: